Secure the drip edge with roofing cement.
Roll roofing installation drip edge.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a distance of 8 feet or so.
The roofing should extend 1 inch beyond the drip edge.
Roll out and cut roll roofing to cover the length of the roof.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Align the roofing with the chalk line and nail down the edge that runs along the drip edge working out any bubbles as you go.
The outside square cut is the basis for all other cuts.
If it doesn t pull the drip edge out slightly from under the shingles.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
Make sure the outer edge extends over the gutter.
Prepare roof edges cant strips.
For extra protection add a 3 foot wide strip on top of the 18 incher.
Place the top edge of the roofing along the chalk line.
Step 8 nail the roofing down every 3 inches.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
How to install a drip edge.
The drip edge goes on the wood deck then paper then roofing material.
An underlayment of felt roofing is optional.
Once you learn how t.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Drive nails every 3 inches along the rake at one end pull it taut and drive nails along the eave edge.
Depends what edge of the roof you are talking about.
You won t enjoy trying to lift up roll roofing to install a segment of flashing or drip edge that you forgot.
In roofing one square equals 100 square feet.
Walkthrough of the basic cut for drip edge installation on your roofing project.
This will be your first course of roofing.
This should give you a 1 inch overhang on the eaves including the top edge of.
On the rake of a gable roof the drip edge metal goes over the paper as shown in the first drawing in the op link but on the eave the drip edge metal goes on first and then the paper over that.
The nails should be about 1 inch from the edges.